Environmental Impact Statement (EIS) Database

EIS Details

EIS Title

Draft Supplement No. 2 to the Final Supplement No. 1 to the 1982 Yazoo Area Pump Project Final Environmental Impact Statement

EIS Number

20200205

Document Type

Second Draft Supplemental

Federal Register Date

10/16/2020

EIS Comment Due/ Review Period Date

11/30/2020

Amended Notice Date

Amended Notice

Supplemental Information

Issuance of Notice of Intent to Prepare an EIS:

EPA Comment Letter Date

State or Territory

MS

Lead Agency

U.S. Army Corps of Engineers

Contact Name

Kenneth Parrish

Contact Phone

601-631-5006

Rating (if Draft EIS)

As of October 2018, EPA discontinued the use of ratings for Draft EISs.



EIS Document(s):

APPENDIX B (Figures) (09Oct20).pdf (17 pp, 1,536 K)

APPENDIX C (Tables) (09Oct20).pdf (18 pp, 424 K)

APPENDIX F-1 (EJ) (09Oct20).pdf (17 pp, 1,469 K)

APPENDIX F-2 (Cultural Resources) (09Oct20).pdf (21 pp, 185 K)

APPENDIX F-3 (Recreation) (09Oct20).pdf (26 pp, 3,483 K)

APPENDIX F-4 (HTRW) (09Oct20).pdf (40 pp, 15,782 K)

APPENDIX F-5 (Wetlands) (09Oct20).pdf (109 pp, 3,510 K)

APPENDIX F-6 (Terrestrial) (09Oct20).pdf (28 pp, 831 K)

APPENDIX F-7 (Waterfowl) (09Oct20).pdf (29 pp, 2,775 K)

APPENDIX F-8 (Aquatic Resources) (09Oct20).pdf (63 pp, 1,553 K)

APPENDIX G (Engineering) (09Oct20).pdf (166 pp, 12,123 K)

APPENDIX H (TES and MBTA) (09Oct20).pdf (116 pp, 5,454 K)

APPENDIX I (Water Quality) (09Oct20).pdf (59 pp, 3,920 K)

APPENDIX J (Mitigation) (09Oct20).pdf (18 pp, 754 K)

APPENDIX K (Monitoring Adaptive Management) (09Oct20).pdf (51 pp, 3,351 K)

APPENDIX L (404(b)(1)) (09Oct20).pdf (30 pp, 1,121 K)

APPENDIX M-1 (Prime and Unique Farmland) (09Oct20).pdf (4 pp, 193 K)

Yazoo_Backwater_Project_SEIS (09Oct20) (002).pdf (92 pp, 1,457 K)